Showing posts with label cabin construction. Show all posts
Showing posts with label cabin construction. Show all posts
Saturday, April 19, 2008
Appliances
We picked up the appliances from Boyer Barge. A chick named Rainbow runs the forklift there she's cool. When appliances arrive that means things are pretty close to moving in. Hurrah!!
Jon drove through camp with a refrigerator in the back of the truck and rounded up Ken, Bear, Kit, Dusty, and Ron to help lift the washer and dryer up on to the loft. Then that night we moved it at least four times and we're still no sure where it will go. I think they just look so new, modern and weird that it is going to take some getting used to. We still need plumbing and a bathroom sink. But first we need more firewood, so that is what we are doing today. 
Anyway the tile seems to be curing allright.
Labels:
cabin construction,
kitchen
Thursday, April 17, 2008
Tile in the bathroom
I was going to go with just the squares but Jonathan asked for flowers.
Labels:
cabin construction,
floors
River Rock Entryway
Bear tracks are hard to make out of rock and cement. I had to use my handy Field Guide to Alaskan Wildlife. What luck finding a rock that looks just like the bottom of a bears foot. I should have tried to sell it on eBay. I hear Pope shaped frozen waffles are in high demand these days. This is actually bridge grout, not cement. But I think I already wrote about that. Nice stuff to work with but I have to remember to let it set a few minutes before starting to drop rocks in.
A few flowers got swallowed by the wet grout. These ones seem to stand out okay.
This will be a fine place to take off wet clothes and house break Jonathan.
Labels:
cabin construction,
floors
No Cabinets, Shelves
I love the new shelves. We beach combed the wood and it has some beautiful worm holes along the edge. All of the wood we used here was part our scaffolding during construction.
Labels:
cabin construction,
kitchen
Wednesday, April 09, 2008
Floors, not that the tar paper was bad.
Labels:
cabin construction,
floors
Thursday, April 03, 2008
This is how the counter came out so far
I love them. It was weird though. We have been planning them so long that when they were in place it just seemed like nothing new. I think we have 18 feet of counter space to work with. The sink is nice, we beach combed it. We bid on a faucet on Ebay since it is a wall mount, its a little hard to find. Hopefully we will win.
We have one more counter to build next to the fridge. Jonathan is going to make it out of the left over bamboo. We ordered our appliances too. That was super scary but I think we did really well. Still I am loosing sleep over it. We have an old fridge and stove but realize with the waterwheel and generator set up they will never have enough power to work. So we ordered a super efficient refrigerator and washer and dryer. We also ordered a propane stove, so we will have to bring in a tank for the propane. Hopefully the supply for this fuel will be available for some time. Gas and diesel supply was spotty this winter. We always have the wood stove though ;) Jon's Mom had to do her laundry by hand on the floathouse when they grew up. Another lady told me how she had just the spot in a river with perfect rocks for doing laundry. All this was just 20 years ago. I don't even want to go there.
Labels:
cabin construction,
kitchen
He'll never be house broken.
I guess this is how plumbers install sinks? Oh yeah and dormers. Oh yeah and the framing. Oh don't forget the ceiling, waterwheel and pantry. Chainsaws for all your building needs.
We have been saving this piece of hemlock for the counter forever. It has been moved and shuffled around so many times. It was the second piece of building material drug down here on the four wheeler, after the center pole for the house. Dave cut the left over from the center pole piece into legs to support the counters.
Labels:
cabin construction,
kitchen
Dream Pantry
The right side wall is covered with shelves just for jars and cans. We jar food alot in the summer and also buy canned goods during case lot sales they have up here in the fall. Hopefully this way we will be able to see what we have so we don't buy twice.
Labels:
cabin construction,
kitchen,
pantry
Monday, March 24, 2008
A new pantry
Jonathan made me a super super pantry. Lots of shelves for big things. A couple of potato and onion bins and big bins for the animal food. The whole right wall is shelving for cans, I even measured the cans so they would fit. There is alot of room for turning around. Originally we were going to stick the washer/dryer in there but we have a different spot now. So now we have the back wall to fill up too. Very good when we only shop about every four to six weeks and do alot of canning in the summer. I should be able to start putting stuff in there any day now.
Labels:
cabin construction,
kitchen,
pantry
Sunday, February 17, 2008
The Wheel is not Spinning
I was hoping the weight of the snow would take down the trees that are all crisscrossed over the "trail" and creek because they seem a bit dangerous. But if the snow didn't take them down maybe they are pretty stable?
Labels:
cabin construction,
Hydro power,
water wheel
Some interior shots, and Harley the Dog
The bright pink(?) wall will have the fridge against it and some shelves and a counter (that I started planing this weekend, I think it is spruce, it is the piece on the saw horse below).
Misty mixed up her own color for the bathroom I think it looks great. We can't put grout on the tile for awhile because it can't freeze for like 30 days or something. Whan we went on vacation we bought a vanity light for the bathroom, but one of the shades broke. It is never easy to get stuff here.
Labels:
cabin construction,
critters
Subscribe to:
Posts (Atom)